happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
P6282529.JPG
June 28145 viewsThe kitchen door now installed with handle/lock and the double key lock dead bolt as this window has glass panes and needs the extra securitypklongball
P8122663.JPG
August 12145 viewsHere we can see the now finished back veranda and some potted plants we put in place already. The overhanging roof is the pump house.pklongball
IMG_3014.JPG
muddy water145 viewsfirst water from 60 metre is very muddyMax&Bee-in-CM
IMG_3538.JPG
check the layout145 viewscheck, double check and triple check the layoutMax&Bee-in-CM
IMG_3742.JPG
Digging foundation holes145 viewsThe macro man hard at work.Max&Bee-in-CM
IMG_4811.jpg
Automatic Pressure Pump145 viewsThis pump will drive water from the storage tank to the house. dozer
IM000529.jpg
the future soccer pitch (child-sized)144 viewssomdet
IM000618.jpg
West facing side144 viewsWe decided to cement this in to make it less messy. There will be a carport at the front (background) and laundry area in the back (foreground). somdet
Pillars.jpg
Pillars144 viewsBoundaries are marked.
Original fence was 40 cm too close to the house. Officials came to measure ans seal new boundaries after complaint. They actually where happy that we found out wrong measurements. We got more space 11 m2. Every inch counts :)
pskog
3D_1st_floor.jpg
1st floor plan144 viewsFinal layout except using old measurements. Final house will be 40 cm wider.pskog
03080016.JPG
144 viewsCookieboy
P1041593.JPG
Rebar formed cages for footings and columns144 views4 Jan 09 View of the rebar assemblies I am calling cages for the footings and columns.pklongball
7141 files on 596 page(s) 145

Debug Info 
Debug Output: show / hide