21 Feb 2009148 viewsThis flight of steps is at the side of the house that gets us up to the back balcony area. So when the forms come off we will have a way up to the floor area from 2 points and no more crawling up and down for the duration of the build.pklongball
|
|
15 April148 viewsLeft front side view. The front entry gable is built and the right side is today and the left side soon.pklongball
|
|
June 28148 viewsThe new casement window in the master bath. Double awning style with opaque glazing.pklongball
|
|
June 28148 viewsGuest bath as seen from the inside and the new window. Very functional and cleanpklongball
|
|
Exterior Switch Installation148 viewsThe exterior switches and outlets are enclosed in weather proof boxes. dozer
|
|
|
Footings and Columns147 views10 Jan 2009 This will be the last photo of open holes. All the footings will be back-filled tomorrow.pklongball
|
|
This path around the house was not on the detailed drawings147 viewsthomas.fontaine
|
|
|
June 26147 viewsNow we have a bedroom door with a beautiful lock set and lever handlepklongball
|
|
Jan.30,2010147 viewsAlmost finished but this is the view of the piping both water and electric.pklongball
|
|
|