28 April150 viewsThe labor crew hand dug this trench around the property perimeter from the septic tank. A series of pipe and boxes will be installed to drain the run out from the septic tank as well as the grey water from the showers and sinks and any water from rain on the land. Ends in the street sewer drainage system.pklongball
June 3150 viewsMore of the cabinet install. Looking here at the bas cabinets for the cooking HOB and the Oven and Microwave cabinetpklongball
Roof tile work resumes now that the metal is almost finished150 viewsMax&Bee-in-CM
roof tiles149 viewsThese are CPAC Monier Zeason tiles. The color is Winter Gray. They cost 18 baht a piece. The apparent difference in size is just an optical illusion created by the height of the stacks of tiles.somdet