Meter plumbing152 views10 Jan 2009 A small not so deep trench was dug across the road and the connection was made. A hole in the walk was created and the meter installed.pklongball
Workers will live on site for the duration of the construction152 viewsthomas.fontaine
Front View152 viewsThere are many glass blocks used in the design which let a lot of light into the house. Notice also the lower blue grey strip and archway is finished in a natural no paint pigment skim coat (as well as the perimeter wall being natural no paint red).dozer
the soffits being progressed 27-08-08151 viewskornoipaddy