Exterior Patio154 viewsThe exterior patio of the condo.dozer
from the kitchen looking towards the front of the house 14-09-08153 viewskornoipaddy
First footing153 views5 Jan 09 This is the first footing poured. 30 more to go.pklongball
Day 21 Starting to form the lower column153 viewsWell they have just a few of the footings poured and already have started to form around the rebar on the poured footings for the next piece of the puzzle. This piece is the lower part of the column that will reach to ground level and just above.pklongball
ready to measure153 viewstaking the first stepsMax&Bee-in-CM
Toilet installed and ready for action153 viewsMax&Bee-in-CM
Concrete floor for the bathroom153 viewsThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CM