22 Jan 2009162 viewsA closer look at the pour crew hard at it.pklongball
|
|
21 April162 viewsBack view of the place as of todaypklongball
|
|
28 April162 viewsThese two water men are installing the cold supply lines. White shirt is the bossmanpklongball
|
|
Diagonal Checks for Column Placement162 viewsThe correct placement of columns is important to the overall project to ensure that the wall angles are as they should be and the house is as designed. Often the only tool used is an external measure + the use of a small square. This shows one additional check, taken from the 3 4 5 triangle rule. If you measure 3 meters along one axis and 4 meters along another axis the diagonal should be 5 meters (or in this case 6, 8 and 10). This is done in addition to measuring the diagonals for equality.dozer
|
|
162 viewsPower points with 4 grounded receptacles will be used throughout the house.
dozer
|
|
Roof161 views Bacofoil leftover form the Xmas dinnerCookieboy
|
|
|
23 March 2009161 viewsThis pair of boxes will have a plug and switch set up so we can plug in a bedside light and switch it on/off without struggling to find the lamp switch.pklongball
|
|
27 May161 viewsAnother shot of the wood trimpklongball
|
|
Initial Formwork for the Lid Pour161 viewsThis shows the initial formwork for the lid pour. The plywood is supported by 2" x 3" form work below. After the pour the form work will be removed.dozer
|
|
Roof tiles160 viewsTwo tone: CPAC Colour: Bagai ThongCookieboy
|
|