The kitchen counter166 viewssomdet
|
|
|
29 Jan. 2009166 viewsOverview of the site just after the first delivery of floor panels.pklongball
|
|
Friday the 13th166 viewsThe reflection off the fresh concrete.pklongball
|
|
9 March 2009166 viewsAnd the welding continuespklongball
|
|
|
|
Front View from the Soi166 viewsHouse was built about 35-40 years ago. Apart from a kitchen and bathroom add on at the back not a lot changed in that time. Some great wood floors, was tempted to keep it for use in the new house but no where to store so gave in and recycled it with the locals.changnoi
|
|
Block Formwork for Tank166 viewsThe cinder blocks are used as form work for the walls of the tank which are re enforced with rebar. dozer
|
|
Rebar Re Enforcement of Lid166 viewsThis shows the framework to support the top of the tank. The rebar used is 6 mm and is spaced about at 10 cm squares. The blue PVC is where the water will enter the tank from the deep artesian pump, the yellow is the electric which will be routed to the electronic valve for the tank and the artesian pump.dozer
|
|
View of Pattaya Bay165 viewsHere is a view of Pattaya bay looking to the right on the balcony. You can see downtown Pattaya in the distance.MsDozer
|
|
Solid teak deck chairs.165 viewsSolid teak deck chairs that you can relax and take in the view from the rear balcony.MsDozer
|
|