Kitchen view167 viewsKitchen should finally look like this...
Small but compact.
On Thai-way patio will be an extended kitchen etc...pskog
The staggered level on the ceiling in the large front room167 viewskornoipaddy
Overview Front167 views We are almost ready to pour the CPAC concrete floor and end phase one of the build.pklongball
Valentine's Day 2009167 viewsThis is almost noon on Saturday after the finish of the floor pour on Friday. The builder will have someone on site watering down the concrete to keep it drying a little slower pklongball
21 Feb 2009167 viewsThe builder decided we needed the steps built now as opposed to waiting. I agreed as now we will have a way to get from the ground to the floor area without the need for makeshift ladders and stuff.pklongball
23 March 2009167 viewsThe other side of the bed gets a switch and plug in the same box . Most bed lamps only have a 2 bladed plug so I thought a good deal here.pklongball
Safefy Tank Preparation167 viewsThe safety tank is supported by two support columns and a 15 centimeter footing. dozer
view from front entry167 viewsFrom front entry way view of kitchen. Ceiling is two level and trimmed at the corner with teak wood. The kitchen floor is done with terracotta tiles.dozer
166 viewsSomething I hadn't picked up from the original plans. Patio is 40cms below the house floor level. Having this raised so the drop is only 10cms. Some sort of drop is recommended to cater for the wet season.Thaifu T
166 viewsGeneral view of the house looking north - this was taken on Christmas DayThaifu T
pouring the cement porch bench railing dealieo166 viewssomdet