happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
Columnplaces.JPG
Marking the column outlines173 viewsThe prep work continues by marking the column locations with boonkaow
16 Dec.'08
pklongball
P1231698.JPG
173 viewspklongball
P3261928.JPG
26 March 2009173 viewsOur new Square "D" Classic load centerpklongball
P6062355.jpg
June 6173 viewsThe work in the kitchen is moving along and now the sink base is in place along with the wall units oven the HOB areapklongball
PC032742.JPG
Dec. 4th173 viewsI am showing off the steel bars on the windows and door here in this shot. The windows have the bars installed on the inside of the window frame and cannot be seen too much from either side as the curtains cover them on the inside. Only one window has an outside bar and that is the kitchen. pklongball
IMG_3775.JPG
Conduit173 viewsThe electrical conduit will run within a designated empty hole within the cinderblock.
dozer
IMG_4121.JPG
In wall power point box173 viewsThe metal boxes are used within the walls but the same tight conduit connections are made with the screw fit connectors.dozer
IMG_5042.jpg
Side View173 viewsThis view shows the side of the house along with the smaller bathroom vent windows + decorative glass blocks that allow blue + white light into the bathroom. The plumbing appliances are properly vented through the roof, notice the roof vent extruding from the cement tiles.dozer
IM000519.jpg
172 viewssomdet
IM000526.jpg
entrance172 viewsHaving glass block instead of the whole entry window treatment saved us quite a bit.somdet
06230039.JPG
172 viewsCookieboy
P3161872.JPG
16 March 2009172 viewsSoon this stack of tile will be on the roof.pklongball
7141 files on 596 page(s) 119

Debug Info 
Debug Output: show / hide