The front steps182 viewsThings are starting to take shape.somdet
|
|
|
Friday the 13th182 viewsThe floor pour as of about 1230 with just the front balcony area to finishpklongball
|
|
9 March 2009182 viewsLong shot of the roof at this stage. The tile will be coming soon.pklongball
|
|
9 March 2009182 viewsAnother angle of the almost finished steelpklongball
|
|
17 March 2009182 viewsThe wall building is interrupted to allow the electrician "Sparky" and helper to install the boxes and conduits for the plugs and switches inside the wall cavity. From now til the Sparky finishes this part they will work together. We can also see the roof crew is moving tiles to the roof area for installation.pklongball
|
|
15 April182 viewsTwo of the team loading the powder mix and water into the bread mixer. When this dough comes out it is ready to apply to the walls and make the nicest, smoothest plaster I've seen. They are very happy the weather is more humid and wet now as the rendering process comes out better if the stuff does not dry too quickly.pklongball
|
|
|
|
Water Tank181 viewsNote the rebar that surrounds the tank and extends out of the walls. This was a part of the rebar meshing used to re enforce the structure. The interior cinderblock is formwork but will remain in the finished structure. It will be rendered with a waterproofing agent as was the cement in the walls of the tank. dozer
|
|
Lanko K10 waterproofing181 viewsAny roof not dry teched will need a waterproofing treatment at the ridges even after any visible imperfections are caulked. This house used this product over every section of ridge joint. dozer
|
|
Hallway to bedrooms180 viewsThis is the entry way to the two bedrooms.MsDozer
|
|