|
Most viewed |
6 March 09'184 viewsTwo of the roof crew welding in the small cross-members to the support channels. The square tube will be the support for the roof tile.pklongball
|
|
|
|
August 12184 viewsA look at my now functional Grundfos pump. Two weeks of use and I am more than happy with the supply from this unit.pklongball
|
|
|
3 Feb 2009183 viewsCarrying the panels from the stack to the house floor takes 4 Thai men and some sweat. They only have about 60 more to go.pklongball
|
|
26 March 2009183 viewsAnother view of the panel with door off and you can see the spot for the main breaker and 24 MCB'spklongball
|
|
29 April183 viewsMaster bath plumbing is now roughed-in. Minimal pipes in the floorpklongball
|
|
29 April183 viewsNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongball
|
|
29 April183 viewsAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongball
|
|
29 April183 viewsMore of the pipes as they come to the yet to be installed sewer pipe.pklongball
|
|
Kitchen Drain Pipe183 viewsThe plumbing, like the electric, runs up a designated empty hole of an oversize cinder block. This one is the kitchen drain pipe.
dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
111 | |
|
|
|
|
|
|
|