186 viewsView from the stairs, living room. The entire open wall in the front is going to be glass.Glenn
|
|
21 March 2009186 viewsWe are looking out the living room window opening.pklongball
|
|
23 March 2009186 viewsHere we have a pair of wall boxes. One is for a duplex plug and the other for the TV/Tel cables. They each have a respective conduit running up the wall cavity.pklongball
|
|
26 March 2009186 viewsAnother day and more of the roof tile is completed. Almost finished nowpklongball
|
|
1 April186 viewsKitchen wall electrical. Boxes for the plugs of the various appliances and direct wire for the oven and the utility plugs.pklongball
|
|
|
|
29 April186 viewsHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongball
|
|
July 10186 viewsHere we have the master bath shower unit installed. This is a Hang Co unit. Combo rain head and hand held sprayer.pklongball
|
|
Flow Rate verification186 viewsThe guaranteed flow rate is 2000 liters per hour. Each canister has a volume of 200 liters, the flow was timed to compute the actual rate. The wells are guaranteed for a period of time and this company is good about servicing wells periodically.dozer
|
|
Water Septic #1186 viewsFirst dirty water septic tank for the bathroom. Five concrete rings of 1 m x 30 cm are surrounded with large gravel. The gravel layer is about 10 cm thick (all the way around the tank).
dozer
|
|