|
Most viewed |
28 March 2009188 viewsThis roof valley will be completed in short order and should have a nice tight fit of tilespklongball
|
|
|
|
2 May188 viewsI think I posted this photo once but just in case here again is the septic tank and the drain pipes from the housepklongball
|
|
188 viewsthe last meal with buildersgeordie
|
|
June 26188 viewsWindow man came out and installed all the slider windows and one door. They are really pretty nice.pklongball
|
|
July 10188 viewsAn overview of the bath and shower todaypklongball
|
|
|
3 Feb 2009187 viewsMoving another panel into positionpklongball
|
|
26 March 2009187 viewsAnd again some arrows point to another section of raceway and the method to hang it. Some holes are drilled into the steel of the roof and they secure it with big "pop" rivets. This will make his cabling job a breezepklongball
|
|
|
Plumbing Entry Exit187 viewsThis shot shows the 3 plumbing entry/exit areas within their designated over size cinder blocks (1 entry/exit in the forward kitchen, 2 in the bathroom). Also note the vent pipes which will run vertically up through the ceiling, will be tied together, and exit through the roof.
dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
107 | |
|
|
|
|
|
|
|