|
Most viewed |

1 April188 viewsThis is Sparky's first real brain fart of sorts. Several outlets and switches are going in this wall and there is no wall yet so he chose this method to get his part done and let the wall guy fill in around the stuff. It's not pretty but it will work and when the walls are finished you'll never see this,,,so mai phen raipklongball
|
|

28 March 2009188 viewsThis roof valley will be completed in short order and should have a nice tight fit of tilespklongball
|
|
|
|

2 May188 viewsI think I posted this photo once but just in case here again is the septic tank and the drain pipes from the housepklongball
|
|

188 viewsthe last meal with buildersgeordie
|
|

June 26188 viewsWindow man came out and installed all the slider windows and one door. They are really pretty nice.pklongball
|
|

July 10188 viewsAn overview of the bath and shower todaypklongball
|
|
|

3 Feb 2009187 viewsMoving another panel into positionpklongball
|
|

26 March 2009187 viewsAnd again some arrows point to another section of raceway and the method to hang it. Some holes are drilled into the steel of the roof and they secure it with big "pop" rivets. This will make his cabling job a breezepklongball
|
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
107 |  |
 |
 |
 |
|

|
|
|