Footing hole189 viewsThe footing hole and base framework on a poured concrete lip.
dozer
|
|
|

Wooden floors going down188 viewsThe wood is a little disappointing, and that's all I want to say, because it pains me to even think about it at the moment.somdet
|
|

Moving right along188 viewsThis was taken from the southeast corner of the lot.somdet
|
|
|
|

14 Jan 2009188 viewsHere we see more evidence that the Beamteam is still working and not sleeping under the shade of the old oak treepklongball
|
|

13 Jan 2009188 viewsThis view in the early stage of steel forming we can see pretty clearly the 16 mm steel used in the floor beam supports.pklongball
|
|

Valentine's Day 2009188 viewsSo we now have a poured floor and this brings an end to this phase of the build. Next week brings the beginning of the roof steel work and maybe morepklongball
|
|

26 March 2009188 viewsAnd here we have a section that is ready for the cables. 4 conduits were bent using a heat gun,,,yes I said heat gun not lighter or some sort of fire on a stick, then attached to holes cut into the bottom of the channel. And the use of the connector and bushings is another requirementpklongball
|
|

1 April188 viewsSome more of the electricians handiwork. All the boxes he installed today come up the wall and join the raceway above the kitchen ceiling.pklongball
|
|