|
Most viewed |

26 Feb 2009193 viewsAnother view of some of the steel work. I am surprised at how much cutting and fitting needs to be done. But these guys are up to it and from my perspective they are doing a great job.pklongball
|
|

19 March 2009193 viewsSo we had a good bit of work on the tile today. I would say about 3 days should get the majority of tile in place.pklongball
|
|

220 V and co-ax TV sockets.193 viewsMost TVs and audio surround systems have 2-pin plugs,so these sockets a re ok for equipment that does not need earthing.jazzman
|
|

26 March 2009193 viewsIn this shot I am pointing some added arrows to the now installed wireway. Sparky is doing a fine job to this point in how he is going about the install of my wiring.pklongball
|
|
|
|

28 April193 viewsThe start of installing the drain lines in one bathroompklongball
|
|

June 12193 viewsMore sanding and finishingpklongball
|
|

June 22193 viewsToday's view of the cabinets waiting now for the wall painting and tiling.pklongball
|
|

Diamond bit rock drill193 viewsA diamond drill bit suitable for underground rocks and obstructions.dozer
|
|
|

Weatherproof switches192 viewsbTicino weatherproof recessed switches. Excellent for switches or opwer in garden wall etc. The lid flips up but the switches can be pressed though the transparent cover. This 3-module unit can be equipped with switches and/or power sockets. Cost around 300 baht. bTicino also make a surface mounted one.jazzman
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
102 |  |
 |
 |
 |
|

|
|
|