happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
P4152002.jpg
15 April195 viewsThe back veranda and the plaster work they just finished.pklongball
080.JPG
Entrance double door195 viewsthomas.fontaine
P7102613.JPG
July 10195 viewsThe sit down shower is also a Hang unit. The Towel bar/rack and wall hanger also Hangpklongball
IMG_4915.jpg
Electric Post195 viewsThe electric company comes to install an electric post. The house meter will be affixed to this post. The electric wire runs from the post directly to the attic area.dozer
IMG_2333.JPG
Sitting area194 viewsThe sitting area with imported leather sofa and marble coffee table.MsDozer
DSC00747.JPG
194 viewsGlenn
DSC00808.JPG
194 viewsLooking down from the stairs, this is going to be the library areaGlenn
05250002.JPG
194 viewsCookieboy
P3261926.JPG
26 March 2009194 viewsSo we come to the panel with no cover and no breakers installed. This is a 3 phase panel in case anyone is wonderingpklongball
IMG_4540.jpg
Air Vent194 viewsAir from the plumbing appliances, such as toilet, sink, floor drains, urinal are properly vented up through the wall and out of the ceiling. This is rather rare in Thai construction but is a standard in other countries. The symptom of improperly vented appliances is that they do not flow properly, the vents allow air into the system so no vacuum is formed, allowing a proper flow.dozer
100_0261.JPG
193 viewsBattens going on the roof. Tiles are screwed into these.Thaifu T
DSC00749.JPG
193 viewsGlenn
7141 files on 596 page(s) 101

Debug Info 
Debug Output: show / hide