21 March 2009197 viewsA little different view from the land next doorpklongball
|
|
15 April197 viewsMaster bedroom. One wall is plastered and one wall needs to be done yet.pklongball
|
|
|
High volume flow196 viewsThis shows the flow out of the pump of plot 4. This flow rate is about 3000 or more liters per hour. dozer
|
|
Electric Routing196 viewsSecuring the electric into place prior to the pouring of the concrete floor.
dozer
|
|
Bad construction195 viewsThis happens when you try to save 6k in the wrong place.
No foundation.
Now Thais are betting when it will fall :)pskog
|
|
|
Rebarman 3195 views4 Jan 09 Rebarman 3 is placing the cages and also placing small, concrete supports under the rebar to raise it up off the bottom of the hole floor so when the concrete is poured it will submerge the cage completely.pklongball
|
|
19 March 2009195 viewsThe walls are going up and the roof tile is also going on at the same time. No hard hats available.pklongball
|
|
21 March 2009195 viewsThe lady brickie is starting to raise the walls in the bedroom over the now poured lintel. There will be two casement windows in this wall.pklongball
|
|
23 March 2009195 viewsThe start of the electrics includes switch boxes. In this case 4 boxes near the front door to control lights in the house and on the veranda and also the car parking area. You can see the traditional method of mounting the box on a horizontal plane.pklongball
|
|
15 April195 viewsThe back veranda and the plaster work they just finished.pklongball
|
|