2 June76 viewsThe view into the living room and the new tile now finishedpklongball
June 776 viewsA different angle but the same day and more of the same sand wash stepspklongball
June 1276 viewsThe tile man is laying some tile at the master bedroom door . The window crew is coming o install the fram and this needs to be done todaypklongball
June 1476 viewsAnother tileman is using the water cutter to cut the granite for the vanity backsplashpklongball
June 1476 viewsTileman using grinding tool to round the edges of the granite toppklongball
2 June75 viewsThe second bedroom is almost finished and will be by days endpklongball
June 1474 viewsSame man different view. This water cooled cut is done with a small tube and siphoned water from a bucketpklongball
June 773 viewsToday the wall crew came around to render the unfinished areas under the balconies that were not complete beforepklongball
June 1273 viewsThe wall man is adding the finish to the now completed column in the backpklongball
June 1473 viewsOne of the bath vanities granite top pklongball
June 1272 viewsThe rear side steps to the balcony and the newly finished tile and aluminum noses on the stairspklongball
June 771 viewsHere the tile crew is working their magic on the sand wash on the back steps. pklongball