June 12138 viewsColumn rendering and the partial counter and cabinet built in the back. This cabinet will house the gas bottles, storage and a shoe rack2 commentspklongball
June 8102 viewsI will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongball
June 12102 viewsToday's view of the back of the house and the new guttering around the veranda eaves. Once it is painted it will almost be invisiblepklongball
June 1292 viewsThe front as it looks today and the guttering around the eave line. Can you see it?pklongball
31 May91 viewsThis is a look at the floor in the living room towards the front door. About 65 percent done here.pklongball
June 1291 viewsI just had to add this photo of Mrs. PK trying her hand at mixing the mud for the tile crew. She lasted all of 2 minutes before her arms gave out.pklongball
June 1491 viewsUnderside view of the new stainless gutter installed a few days ago. Now the gutter is primed and ready for the color to match the eavespklongball
June 1290 viewsAnother inside view of the second bath and the floor and now partially built vanity for the sink.pklongball
31 May89 viewsThe kitchen floor is about 80 percentpklongball
June 1289 viewsNow the second bath floor is almost finished. Just some grout work to do.pklongball
2 June88 viewsLooking from the kitchen door to the front door and the tile folks finishing their workpklongball
2 June85 viewsThe tile grout lady. She does about 80% of the finishing workpklongball