June 3091 viewsOne of the dimmer switches for the lightspklongball
18 May90 viewsThis part of the trench heads to the house under the foundation wallpklongball
19 May90 viewsHere we have Sparky just starting to feed the 4 conductor NYY cable into the PE pipe. The 16mm2 cable is 65 meters long and very heavy.pklongball
19 may90 viewsSparky started feeding in the NYY cable and his helper was under the house pulling it. After about 15 meters the cable stopped and his mate was almost spent trying to pull the cable alone. Sparky enlisted the help of the tile installers. In this view tile man 1 is helping to feed cable and tile man 2 went under the house to help pull.pklongball
June 3090 viewsHere we have the Electric man wiring the first of two lamp fixtures with the electronic ballasts need to light the lights.pklongball
June 3090 viewsA little closer look at one of the down lightspklongball
18 May89 viewsSparky is feeding into the 2 inch pipe a piece of stiff wire that will be used as the pulling wire for the NYY cablepklongball
19 May89 viewsHere we can see the NYY cable and the now attached pull rope.pklongball
21 May89 viewsThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
19 May88 viewsAnother view of the two cable feeders. Before the needed length was pulled in , tile man 1 went under the house to help pull. So we ended up with 3 pulling and one feeding. But in about 20 minutes or so it was done.pklongball