9 May 2009109 viewsMore of Sparky's handi-workpklongball
8 May108 viewsAnother view of the mass of electric wires being pulled and installed.pklongball
8 May108 viewsOne of the many boxes in the ceiling area that has several junctions.pklongball
8 May107 viewsI climbed up a tall ladder today to inspect the wiring and stuff from close up. Here is one view of the raceway now with some wire.pklongball
8 May107 viewsMore conduit, raceway and wires. pklongball
8 May106 viewsThe beginning of the final wiring for the load centerpklongball
8 May105 viewsOne of the many boxes in the ceiling area that has several junctions.pklongball
18 May105 viewsA view of the trench looking back to the streetpklongball
11 May103 viewsA not to close view of the newly installed cabling for the 3-phase hookup we will have in a month or two. Sparky called in the local PEA inspector to look over the house wiring and it just so happens that this guy also moonlights installing pre-meter install wiring. So now we have this covered and when the main connect is need we already have his approval so one step closer to having power.pklongball
11 May103 viewsA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball
5 May98 viewsAnother view of the newly pulled wire for the bedroom down lights and fanpklongball
18 May94 viewsMore trench on its way to the housepklongball