28 March 2009221 viewsThis view of the panel shows how Sparky ran the conduits down the wall and under the floor.pklongball
|
|

17 March 2009204 viewsSparky and helper installing a pipe and boxpklongball
|
|

26 March 2009204 viewsThis shot is Sparkie's right hand man installing a section of the wireway metal chase we decided to use instead of the standard conduit and boxes. This chase will join all areas of the ceiling area together to allow cables to be pulled to any conduit stubs from the main load center as well as travel to other points.pklongball
|
|

23 March 2009195 viewsThe start of the electrics includes switch boxes. In this case 4 boxes near the front door to control lights in the house and on the veranda and also the car parking area. You can see the traditional method of mounting the box on a horizontal plane.pklongball
|
|

26 March 2009194 viewsSo we come to the panel with no cover and no breakers installed. This is a 3 phase panel in case anyone is wonderingpklongball
|
|

26 March 2009193 viewsIn this shot I am pointing some added arrows to the now installed wireway. Sparky is doing a fine job to this point in how he is going about the install of my wiring.pklongball
|
|

21 March 2009192 viewsThis view of the pre-wired AC for the master bedroompklongball
|
|

21 March 2009190 viewsI included a view of the pre-wired aircon so I can remember where the wires and pipes are located for future needspklongball
|
|

26 March 2009190 viewsA shot here of the now installed raceway but before the conduit is connected to the bottom of the channel with bushings.pklongball
|
|

26 March 2009189 viewsHere we have the start of installing the wireway. We are using 2 x 4 by 2 meter sections. These are connected to each other as needed to form the raceway for all the power cabling. Various hand and electric tools are used in the process of assembling the sections.pklongball
|
|

28 March 2009189 viewsToday the main panel is installed and all the conduits are in place both up to the raceway for the feeder cables and down under the floor for the main supply cables and the feeders to and from the car park panel. We have added a small box next to the panel that will have the RG 6U cables (TV & True) and telephone cables in and out.pklongball
|
|

26 March 2009188 viewsAnd here we have a section that is ready for the cables. 4 conduits were bent using a heat gun,,,yes I said heat gun not lighter or some sort of fire on a stick, then attached to holes cut into the bottom of the channel. And the use of the connector and bushings is another requirementpklongball
|
|
|

|
|
|