Most viewed - Phala - "The Walls" |
9 March 2009241 viewsMoving the Q Con blocks into positionpklongball
|
|
23 March 2009240 viewsThis is the exterior living room wall about half way up and you can see the double blocks and cavity. This wall is almost ready for form wood to make the window and beampklongball
|
|
9 March 2009237 viewsMoving the blocks from point A to point B is backbreaking and sweaty work and always the ladies get this job.pklongball
|
|
16 March 2009236 viewsHere we have the beginning of the long exterior kitchen wall. If all goes well this will have the cooktop, oven and micro along this length.pklongball
|
|
16 March 2009236 viewsThe very early stage of the wall build. This view is from the master bedroom looking through what will be a window across the balcony to the kitchen door.pklongball
|
|
Overview 16 March 2009234 viewsAnother view and perspectivepklongball
|
|
16 March 2009234 viewsA wall begins. This wall happens to be the left wall of the storage room and the master bedroom doorway next to the column.pklongball
|
|
17 March 2009234 viewsThe view today March 17. happy St Patty's Daypklongball
|
|
19 March 2009233 viewsI added this shot of this column to show a small problem we had in discussing the outdoor lights on the columns. Sparky had to chisel out the brick here and re-route the pvc to the outside of the column not the place he put it. Small but crucial to locate this decorative light on the correct side of the column. One of those confusion things when we were all talking and pointing where things should be placed.pklongball
|
|
17 March 2009228 viewsThe wall work, roof tile work and electric pipe work all going on at the same time.pklongball
|
|
16 March 2009226 viewsTwo of the brick team building the brick around the columns for later renderingpklongball
|
|
Column brickwork225 viewsHere we have a lady mason and helper laying the outer bricks to a column for that finish laterpklongball
|
|
54 files on 5 page(s) |
2 | |
|
|
|
|
|