11 March 2009319 viewsOne of the team using a saw to make a small channel in the block top to place the steel rebar between the blocks. This rebar is seated into the column and will hold the block wall to the columns for some more stabilitypklongball
|
|
11 March 2009316 viewsThe outer kitchen wall up o the level needed for the lintel beam install. On a wall with no windows a beam will be built in about halfway up the height of the wall.pklongball
|
|
6 March 09'314 viewsToday the Q-Con blocks were delivered to the site. Total on the truck was 2,000 blocks. The walls will begin soon.pklongball
|
|
11 March 2009311 viewsLaying the rebar into the block groove before the glue and the next course of blockpklongball
|
|
11 March 2009291 viewsHere we have a start on the outer bathroom walls and one interior wall between the bath and 2nd bedroompklongball
|
|
11 March 2009289 viewsMore block to be installedpklongball
|
|
11 March 2009276 viewsWall man fixes a wood form to the floor to make the corner walls for the store room bedroom wallspklongball
|
|
11 March 2009265 viewsThis is the beginning of the master bedroom outer wall.pklongball
|
|
11 March 2009261 viewsWe now have a small team of 2 men and a woman working on the walls. The first process will be to start a course up to a level just below any window openings or on a wall with no window about half way up. They will stop there to begin another wall. Once all the walls are started with the outer course we will call in he electrician to start installing the conduits in the cavities for all the plugs and switches.pklongball
|
|
16 March 2009261 viewsThe living room exterior wall where I hope to place the wide screen TVpklongball
|
|
19 March 2009250 viewsHere we have a view of part of a wall and the pvc electric pipe install. This wall happens to be near the back of house that will have a window to look on the back yardpklongball
|
|
9 March 2009242 viewsThis is the beginning of the wall work. Nothing dramatic yet but needs to be done. Two ladies were assigned the job of moving the 2,000 odd blocks onto the floor area in selected places to make them ready for the wall team to start installing them.pklongball
|
|