Living Room Front Window386 viewsThis window frame will have four opening windows and a non-opening glass center.Rick B
|
|

386 viewsWooden stairs being installedRick B
|
|

385 viewsDriving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B
|
|

385 viewsAll columns for the house are now raised.Rick B
|
|

381 viewsThis is a double pile footer arrangement. A single column will come out of this hole.Rick B
|
|

Alligning Window Frame379 viewsWe used mai takien for our frames and windows. Here they're alligning one of the living room windows before cementing it in place.Rick B
|
|

377 viewsPouring concrete in the garage areaRick B
|
|

373 viewsSliding door to side deck being installedRick B
|
|

Upper Roof Starting371 viewsAfter the second floor was poured, they began installing the upper roof steel. Rick B
|
|

367 viewsFooter hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B
|
|

367 viewsCeiling support in living roomRick B
|
|

366 viewsFront fence after renderingRick B
|
|
|

|
|
|