462 viewsForms and rebar for the first floor beams are ready for the concrete pour.Rick B
457 viewsFirst floor columns' forms are being assembled after the floor beams were completed.Rick B
452 viewsInside kitchen after cabinets and doors installedRick B
444 viewsPre-stressed floor slabs for the first floor are being delivered direct from the factoryRick B
443 viewsFirst floor beams are ready for the floor slabs (pan peun)Rick B
Side Deck Roof442 viewsWork on the side deck roof support steel is now underway. This roof will also extend to the rear of the house to cover the outdoor Thai kitchen.Rick B
436 viewsColumns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick B
435 viewsRebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick B
Interior Walls Starting433 viewsStarting to lay block for the interior walls. Staircase to the second floor is behind worker and will eventually be covered with wooden steps.Rick B
432 viewsOutside thai kitchen counter being pouredRick B
429 viewsFirst floor columns are being fitted with formsRick B
Kitchen Before Windows428 viewsProBlock (similar to SuperBlock and sold by HomeMart) on outer wall and opening ready for installation of window frame.Rick B