happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

Most viewed - View Talay 2 Condo
IMG_3189.jpg
Wall Tile47 viewsWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer
IMG_3019.jpg
Original Kitchen Granite46 viewsThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer
IMG_3203.jpg
Trim Piece45 viewsInstalling the aluminum trim piece.dozer
IMG_1656.jpg
Original View Toilet44 viewsThe original view of the toilet and stained tile area.dozer
IMG_3151.jpg
Flintkote44 viewsA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozer
IMG_3249.jpg
Sink44 viewsThe sink is left to dry after it is installed along with the granite counter top.dozer
IMG_3109.jpg
Don't Buy a Toilet43 viewsDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozer
IMG_3118.jpg
Removing Existing Sink41 viewsThe above counter mount sink was removed and this granite counter will be removed.dozer
IMG_3115.jpg
Tile Removal40 viewsThe tile removal took longer than anticipated.dozer
IMG_3117.jpg
Existing Above Ceiling Area37 viewsThese pipes in the ceiling area are from the condo above. dozer
IMG_1657.jpg
Original View Bathtub34 viewsThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozer
 
35 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide