happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

Most viewed - View Talay 2 Condo
IMG_3215.jpg
Toilet Adjustor53 viewsThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer
IMG_3131.jpg
Flintkote52 viewsStarting to flintkote the floor area. dozer
IMG_3152.jpg
Flintkote52 viewsAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozer
IMG_3136.jpg
Electric in Ceiling50 viewsLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer
IMG_3127.jpg
Laying in the Plumbing49 viewsEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozer
IMG_3137.jpg
Preparing for New Control Box49 viewsPreparing the wiring for a new square D electrical panel.dozer
IMG_3246.jpg
Granite Faucet Hole48 viewsOn site drilling of the faucet hole for the granite counter.dozer
IMG_3251.jpg
Granite Skirting48 viewsInstalling and adjusting the position of the granite skirting on the front of the under mount sink.dozer
IMG_3306.jpg
Wood Frame48 viewsThe wood is teak plywood on top of a frame made of furniture wood.dozer
IMG_3308.jpg
Installing the Wood Structure48 viewsThe wood work is done offsite and then brought in and installed in pieces. The electric which feeds in will support the LED lighting. dozer
IMG_3147.jpg
Ceiling47 viewsPlastering up the joints and screw heads in the new ceiling.dozer
IMG_3158.jpg
Wall Tiles47 viewsThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer
35 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide