happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

Most viewed - View Talay 2 Condo
VT2AFTER.youtube
After Clip90 viewsThis clip shows the finished bathroom with new cabinet wood doors, sink, granite counter, above counter woodwork, tiles, shower enclosure and plumbing work for washer. dozer
VT2BEFORE.youtube
Condition Prior to Remodel Clip76 viewsThis clip shows the condition of the condo prior to the remodel, especially the bathroom. dozer
IMG_3398.jpg
Washer74 viewsThe electrolux washing machine. Notice the bticino weather proof electric box and water valve.dozer
IMG_3382.jpg
Christina Shower Enclosure66 viewsThese are measured and cut to order but are not cheap. The stainless think panel glass would not work because a sliding door is needed to conserve space. dozer
IMG_3346.jpg
Fagor Water Heater65 viewsThis is a small Fagor Hot Water heater. The temperature adjustment is made at the shower faucet.dozer
IMG_3347.jpg
Toilet65 viewsThis standard brand toilet uses an adjuster that allows the center of the toilet hole to be less than the standard 30.5 cm. dozer
IMG_3351.jpg
Woodwork63 viewsThe wood work is using a thin teak plywood as a exterior finishing material attached to an internal wood frame. The wood work here is by our favorite wood worker and is really good.dozer
IMG_3248.jpg
Adhesive Concrete Mix61 viewsApplying an adhesive concrete mix to support the granite skirting.dozer
IMG_3313.jpg
Granite Counter and Wood Doors57 viewsThe under mount sink and the granite counter top works nice in this condo. The wood doors on the bottom allow for easy access to the storage space below. Notice the tile trim piece is aluminum (as opposed to plastic trim).dozer
IMG_3159.jpg
Installing Square D Panel56 viewsInstalling the 6 station square D panel.dozer
IMG_3314.jpg
Close Up of Finished Wood Work55 viewsThere is a left shelf and framed mirror along with the top ornamental lamp station. The lighting on top is LED lights.dozer
IMG_3200.jpg
Floor Level53 viewsThe floor is poured level in preparation of the floor tiles.dozer
35 files on 3 page(s) 1

Debug Info 
Debug Output: show / hide