Tile: Level Line32 viewsA level line is being determined for laying the tile. dozer
|
|
Prepping to Primer31 viewsGetting the wall ready to primer. The upper trim is kept, caulking is being applied to the between the concrete ceiling and the trim. Wall paper is being scrapped off. dozer
|
|
Water Line31 viewsThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozer
|
|
Old Carpet and Padding30 viewsThe old rotted out carpet and padding pulled back in an area with some water damage.dozer
|
|
Grout Line30 viewsThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer
|
|
Wall Paper29 viewsThe wall paper starting to peel in an area where there was some water damage.dozer
|
|
Grouted Tile Section29 viewsA completed and grouted section of tiles.dozer
|
|
|
|
|
|
|