happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > Kiang Talay Condo

Most viewed - Kiang Talay Condo
KSams-0046.jpg
Tool for Applying a Fitting37 viewsThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozer
IMG_0877.jpg
True Line36 viewsA true line indicating where the edge of the tile should be. dozer
IMG_0921.jpg
Putty Applied36 viewsWall putty is applied to smooth the area where the new electric outlet is. dozer
IMG_1034.jpg
Original Bathrooom36 viewsThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer
IMG_0889.jpg
Leveling the Tiles35 viewsLeveling the tiles in place after they are laid. dozer
IMG_0732.jpg
Shower Curtain and Tub34 viewsThe shower curtain and tub, covered in old dust and grime. dozer
IMG_0872.jpg
Applying the Slurry Mix34 viewsApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozer
IMG_0728.jpg
Before Unoccupied Condo33 viewsThis condo had not been occupied in several years and was as originally built except that everything in the condo had deteriorated.dozer
IMG_0729.jpg
Wall Paper33 viewsThere was ugly wall paper on the wall and blue carpet on the floor, along with a bunch of really old furniture. The carpet had some water damage and the wall paper was peeling off the wall. dozer
IMG_0838.jpg
Height of Tile33 viewsThe red chalk line is established by measuring down from the level line.dozer
IMG_0913.jpg
Wall Imprefection33 viewsThe painter fixing a wall imperfection. dozer
IMG_0736.jpg
Scrap A/C32 viewsScrap A/C unit sits on old blue carpet.dozer
31 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide