Most viewed - Kiang Talay Condo |

Walkthrough of Finished Condo47 viewsA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer
|
|

New Electric Receptacle46 viewsA new electric receptacle is established. dozer
|
|

Grounded Electric42 viewsA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer
|
|

Finished Floor Section42 viewsThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer
|
|

Secured Flexi Pipe41 viewsThe flexi pipe is run into the bathroom and is secured in place.
dozer
|
|

Water Heater41 viewsA new Stiebel water heater was installed along with a VRH stainless shower head. dozer
|
|

Starting Tiling40 viewsThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozer
|
|

Electric Outlet w Tele Jack39 viewsNew electric outlet with a telephone jack.dozer
|
|

Bathroom38 viewsThe bathroom was dirty but otherwise in OK condition, considering. We left the bathroom as is with just some clean up and a new water heater.dozer
|
|

Flexi Pipe Cutting38 viewsThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozer
|
|

Water Line37 viewsA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozer
|
|

Grouting the Skirting37 viewsGrouting the skirting and floor tiles. dozer
|
|
|

|
|
|