Home > House Construction > Village House > Perimeter Wall

Most viewed - Perimeter Wall
P8010334.JPG
62 viewsdozer
IMG_8485.jpg
41 viewsThe upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer
IMG_8518.jpg
39 viewsExisting section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer
IMG_8484.jpg
36 viewsPreparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer
IMG_8483.jpg
33 viewsCinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
IMG_8490.jpg
32 viewsThe poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer
IMG_8514.jpg
30 viewsOne worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer
IMG_8515.jpg
30 viewsOn 40 meter section prior to completion. dozer
IMG_8491.jpg
30 views3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozer
IMG_8502.jpg
29 viewsPlacing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer
IMG_8505.jpg
28 viewsSupport member to add strength to the wall section, along with view of more drainage pvc pipes. dozer
IMG_8513.jpg
28 viewsSprinkling water on the wall surface during the rendering process. dozer