happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Village House > Perimeter Wall

IMG_8490.jpg
The poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer
P8010334.JPG
dozer
IMG_8483.jpg
Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
IMG_8484.jpg
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer
IMG_8485.jpg
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer
IMG_8491.jpg
3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozer
IMG_8502.jpg
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer
IMG_8505.jpg
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer
IMG_8513.jpg
Sprinkling water on the wall surface during the rendering process. dozer
IMG_8514.jpg
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer
IMG_8515.jpg
On 40 meter section prior to completion. dozer
IMG_8517.jpg
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer
13 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide