The poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer
|
|
|
Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
|
|
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer
|
|
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer
|
|
3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozer
|
|
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer
|
|
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer
|
|
Sprinkling water on the wall surface during the rendering process. dozer
|
|
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer
|
|
On 40 meter section prior to completion. dozer
|
|
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer
|
|
|
|
|
|