16 viewsThis shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer
16 viewsThe wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer
15 viewsThe counter after the cement pour. (27-Apr-04)dozer
14 viewsPartially finished counter with supporting brick columns.dozer
14 viewsEach cabinet section has a wood door. dozer
14 viewsThis shows a relatively think layer of stucco is applied.dozer
14 viewsThis shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozer
13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
13 viewsMetal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer