27 viewsKitchen floor tile. (26-May-04)dozer
|
|
25 viewsThe repaired roof valley. This was kind of a struggle due to inadequate valley aluminum which was then compensated for by using two pieces which are welded together. In any event the valley now looks good and there is no problem with water leakage. (02-May-04)dozer
|
|
25 viewsThe house has 5 variable mounted roof fans and 35 down lights. In this room the down lights are on dimmer switches. All of the down lights as well as all of the electric is 'grounded'. (18-Jun-04)dozer
|
|
25 viewsThe bathtub being framed in the large bathroom. It will be supported by 4 columns of red bricks and will be enclosed in tile. There are still two more columns of bricks to be added. (25-Jun-04)dozer
|
|
24 viewsThis is the starting shot, showing the plot leveled. The plot starts before the truck on the left and goes to the corner tree line. By this point the plot has already been leveled with fill dirt. (01-Jan-04)dozer
|
|
24 viewsThis shot shows a piece of tile being laid in. A straight line is used as a guide. Also the line is used to evaluate the level of the tile (so that any unevenness in the floor is taken care of). (14-May-04)dozer
|
|
24 viewsThis is a heavy duty (and also just plain heavy!) 75 liter wall mount hot water heater. There are metal brackets on the other side of the wall to add holding support. (04-Jun-04) dozer
|
|
24 viewsThe 1600 liter water tank. This tank has an electronic valve which allows the tank to drop to 1/2 full (or are you thinking 'half empty'?) before turning the pump on to refill it. There are two pumps used, one pumps from the tank to the house and one pumps from the well to the tank. (02-Jul-04)dozer
|
|
23 viewsThe perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozer
|
|
23 viewsThis shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozer
|
|
23 viewsThe floor tiling is complete. Now the only thing left to do is do a 10 centimeter tile border around the entire floor. (30-May-04)dozer
|
|
23 viewsThe finished large bathroom attached to the master bedroom. (06-Jul-04)dozer
|
|
|
|
|
|