20 viewsA tile mesh pattern is created above the sand flooring.dozer
19 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
19 viewsThe still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer
18 viewsPour in progress in the front bedroom.dozer
18 viewsTo prepare for the pour metal rebar (gauge 2 hun) is hand tied into a mesh pattern. (20-Apr-04)dozer