|
Most viewed - Plumbing |
Finished Submerged Water Tank56 viewsThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer
|
|
Hole for Submerged Water Tank54 viewsThis shows the start of the 1800 liter underground water tank. dozer
|
|
PVC Pipe Joined to Tested Section54 viewsThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozer
|
|
Capped Pipes53 viewsClose up of the caps temporarily used on the drain pipes.dozer
|
|
|
|
|
|