happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2 > Plumbing

Most viewed - Plumbing
IMG_9215.jpg
Poured Underground Water Tank64 viewsThe poured underground water tank. The wall thickness is 15 centimeters. The dimensions are about 2.5 meters x .70 meter width by 1 meter depth. dozer
IMG_9171.jpg
Framed and Poured External Walls64 viewsAfter the floor pour is completed, the framework as seen is installed and the external walls are poured to a thickness of 15 centimeters. dozer
IMG_9629.jpg
Sloped Bathroom Floors64 viewsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozer
IMG_9062.jpg
Septics after Pour62 viewsThe service openings are placed to be level with the walkway. dozer
IMG_8851.jpg
Drain Pipe Test61 viewsDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozer
IMG_8679.jpg
Pipes Capped61 viewsNotice that in this shot the damp course has been put in place along with the support rebar for the floor pour. All drain pipes + inbound water pipes have been properly 'capped' (see the end of the PVC pipe) with a removable 'hat'. This will prevent any concrete contamination from entering and restricting flow within the pvc piping during the construction process. dozer
IMG_9713.jpg
Service Opening Water Tank61 viewsThe finished and plumbed water tank with the automatic pump on top. dozer
IMG_8769.jpg
Pipes after Floor Pour60 viewsA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
IMG_8814.jpg
Pressurized Water Pipe Test58 viewsA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozer
IMG_9728.jpg
Tank Service57 viewsThe inside of the tank being cleaned of any debris.dozer
IMG_9597.jpg
Lanko K11 Waterproofing57 viewsThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer
IMG_9274.jpg
Additonal Waterproofing Agent Applied to the Bottom56 viewsLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozer
28 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide