IMG_8654.jpg
Septics127 viewsThere are overall three septics, each consists of five one meter diameter concrete rings with a four centimeter surrounding gravel pad.dozer
IMG_9769.jpg
Proper Leveling of Toilet115 viewsThe toilet being check for level during installation.dozer
IMG_8666.jpg
Plumbing Drain Pipes80 viewsThis shows what is to be the bathroom floor. Note the 4" solid waste drain and 2" shower drain. The smaller diameter pvc pipes are the pressurized water service pipes which will run from the automatic pump to the inbound fitting within the wall of the house.dozer
IMG_9241.jpg
Undermount Stainless Kitchen Sink71 viewsThe under mount stainless kitchen sink will sit under the custom cut granite counter top.dozer
IMG_9045.jpg
Septics Prior to Walkway Pour70 viewsThis shows the septics prior to the walkway being poured. dozer
IMG_9185.jpg
Simple Septic70 viewsAnother view of a simple septic system with the waste pipe entering the concrete rings a a sufficient angle to allow flow. All of the septics are vented with the exhaust about the perimeter wall. dozer
IMG_9131.jpg
Framework for Water Tank70 viewsAnother view of the frame work lattice which sits on top of 6 small footings. The framework is centered to be within the external wall using red bricks a spacers.dozer
IMG_9129.jpg
Rebar Framing for Water Tank68 viewsThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer
IMG_9044.jpg
Septic Service Opening67 viewsThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozer
IMG_9132.jpg
Sika Water Proofer67 viewsSika 'gan sum' waterproofing agent is added to the concrete mix.dozer
IMG_9294.jpg
Framing for Top of Enclosure65 viewsThe framing for the top of enclosure. Notice the rebar lattice with spacing of 20 centimeters. The lid/service opening is sized at 50 centimeters by 50 centimeters. There is an entry pipe, water level solenoid pipe, and exit pipe (to feed to the automatic water pump into the house). dozer
IMG_9681.jpg
Water Heater65 viewsThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozer