happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #1 > Main Structure

Most viewed - Main Structure
IMG_3917.JPG
240 viewsAnother shot of the bathroom wall, showing the decorate glass block inserts, which are, in the case of the bathroom, inserted 2 blocks thick. The outside block of these group of 4 blocks, which will be located in the shower stall, are opaque (the light will come in, but shapes cannot be made out inside the shower stall).
dozer
IMG_4190.JPG
Straight Tool used During Render238 viewsDuring the render application this tool is used to set the wall straight between depth indicators. dozer
IMG_3980.JPG
Beam #3236 viewsThis shows beam #3, the top most part of the load bearing walls, after being bored. This beam had 2 lengths of 12mm rebar run horizontally throughout. Note that the electric conduit and vent pipes extend vertically through the beam.
dozer
IMG_3978.JPG
Form Work for Beam #3236 viewsThe wood form work is put in place for the concrete pour of the final (third) horizontal beam at a height of 3 m. to 3.2 m.
dozer
64 files on 6 page(s) 6

Debug Info 
Debug Output: show / hide