240 viewsAnother shot of the bathroom wall, showing the decorate glass block inserts, which are, in the case of the bathroom, inserted 2 blocks thick. The outside block of these group of 4 blocks, which will be located in the shower stall, are opaque (the light will come in, but shapes cannot be made out inside the shower stall).
dozer
|
|
Straight Tool used During Render238 viewsDuring the render application this tool is used to set the wall straight between depth indicators. dozer
|
|
Beam #3236 viewsThis shows beam #3, the top most part of the load bearing walls, after being bored. This beam had 2 lengths of 12mm rebar run horizontally throughout. Note that the electric conduit and vent pipes extend vertically through the beam.
dozer
|
|
Form Work for Beam #3236 viewsThe wood form work is put in place for the concrete pour of the final (third) horizontal beam at a height of 3 m. to 3.2 m.