Home > House Construction > Chok Dee #1 > Main Structure

Most viewed - Main Structure
IMG_3913.JPG
Front of House297 viewsThe front of the house. Note the window openings each have a vertical rebar column on each side. A 10 cm beam will be poured across the top of the window and door openings at a 2.1 m distance from the floor.
dozer
IMG_3653.JPG
Different Size Crushed Stone295 viewsNotice the two different sizes of crushed stone aggregate that will be used. The smaller one on the left is used for concrete which will be poured into the large cinderblock holes.
dozer
IMG_3901.JPG
Tubing Used for Level of Beam #2295 viewsThin plastic tubing which is filled with water is used to determine a level horizontal line for the 10 centimeter beam which will run along the entire structure above the window level. The beam will be located between 2.1m - 2.2m from ground level.
dozer
IMG_3898.JPG
Decorative Glass Blocks293 viewsThe design calls for decorative blocks at several places. Within the bathrooms the blocks are laid in place 2 thick. Each block is 8 cm wide and the rendered wall will be 16 cm - 18 cm wide (the oversize cinder blocks at 16 cm wide). Notice the use of 1 cm wood spacers, which keep the blocks and equal distance apart. Both wood and prefabricated plastic spacers were used.dozer
IMG_3717.JPG
Ready Mix Pour of the Floor288 viewsNote the consistency of the concrete. It should have just enough moisture to be able to work it and not be watery.
dozer
IMG_3733.JPG
Concrete Flooring286 viewsHere the surface has been smoothed and is almost complete. Notice how there is only a very thin layer of moisture on the surface. Water is an enemy of concrete, too much is not a good thing.dozer
DSC03115.JPG
Missing Foundation Columns281 viewsThis structure only has two traditional foundation columns, located at the front side of the front patio. The other columns have been replaced by the load bearing walls used as an integral part of the design.dozer
IMG_3759.JPG
Use of Metal Scaffolding helps with Plumb Lines279 viewsReally tall metal scaffolding to be used in conjunction with laying the load bearing walls. Since there are no columns being used, extra attention to detail needs to be paid to laying the block work true. The scaffolding helps in this regard as a plumb line is set up and affixed to the metal scaffolding, which isn't subjected to movement as wood scaffolding would be
dozer
DSC03131.JPG
Glass Blocks279 viewsThis shot shows glass blocks being installed and the use of plastic spacers at the intersections to keep the blocks equidistant (spacing of 1 cm). dozer
DSC03181.JPG
Interior Wall279 viewsThe start of the interior wall laying process. dozer
IMG_4187.JPG
Render Brush276 viewsThe brush is used during the render application to sprinkle water on the render as it is starting to dry, then it is polished with a cement trowel.dozer
IMG_3972.JPG
Rebar Frame Work for Beam #3273 viewsThis is the rebar framework which will go in the top horizontal beam, located at a distance of 3 m. - 3.2 m from the floor level.
dozer