happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Secured Storage Room

Most viewed - Secured Storage Room
IMG_2112.jpg
Top Mesh39 viewsThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
IMG_1950.jpg
Double Wall38 viewsThe double wall has a layer of poured re enforced concrete in the middle. dozer
IMG_1963.jpg
Walls Reinforced36 viewsThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozer
IMG_2566.jpg
Finished Secured Metal Partition34 viewsThe completed metal partition with door. dozer
IMG_2075.jpg
Working on Top Mesh33 viewsThe top metal mesh work is additionally welded to the roof structure for support. dozer
IMG_2122.jpg
Affixing Side Beam31 viewsThe side metal beams were affixed to the wall with anchor bolts. dozer
IMG_2528.jpg
Rear Window31 viewsThe secured rear opening. dozer
IMG_2158.jpg
Guide Lines30 viewsEstablishing a guide line for the cross supports. dozer
DSCN0471.jpg
Upper Transition30 viewsThe upper length of structural steel tubing is used as a transition into the ceiling. dozer
IMG_2118.jpg
Metal Divider on Floor29 viewsThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer
IMG_2179.jpg
Attaching the Guide Bar29 viewsAttaching the guide bar to be used in fitting in the last row of cross members. dozer
IMG_2178.jpg
Guide Bar28 viewsDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer
15 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide