|
Most viewed - Ceiling |
Repairing Screen54 viewsFitting the screen into place over some spots that were inadvertently missed by the ceiling installer.dozer
|
|
Drywall Sheeting Applied53 viewsThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozer
|
|
Setting in the Cross Supports52 viewsSetting the cross supports into place for the exterior ceiling.dozer
|
|
Cutting Smart Board52 viewsThe smart board comes in sheets and is cut to size as needed. dozer
|
|
Blue Vinyl Meshing52 viewsThe blue vinyl meshing being fixed into place. If there are any voids it is important to mention it and follow up and check to make sure it gets fixed because it is hard to get at later. dozer
|
|
Ceiling after Plaster51 viewsThe interior ceiling after taping and plastering prior to finishing sanding. dozer
|
|
Affixing Screen51 viewsAffixing a piece of metal screen to the aluminum ceiling frame. dozer
|
|
Service Entry49 viewsThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozer
|
|
Metal Screen49 viewsAn aluminum based screening material being used here. This is much more expensive than the vinyl type eventually used and not noticeably more durable. dozer
|
|
Wood Trim49 viewsWood trim installed around the columns by the ceiling guys needed to be reworked because some of the joints were not done properly. dozer
|
|
Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
|
|
Exterior Ceiling Frame47 viewsInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer
|
|
|
|
|
|