Most viewed - Ceiling |
Aluminum Rail Framework62 viewsInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozer
|
|
Upper Strap Connection62 viewsThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. dozer
|
|
Lower Strap Connection62 viewsThe strap used to hold the ceiling frame in place. dozer
|
|
Above Screen Section60 viewsScreen section above the ceiling. dozer
|
|
Level Establish for Outer Step57 viewsThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozer
|
|
Two Types of Screening57 viewsTwo types of screening are installed under the smart board. The screen prevents insects entering the attic area since the smart board is vented. dozer
|
|
Ceiling Secured Room56 viewsThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozer
|
|
Drywall Piece Installation55 viewsA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer
|
|
Installing Service Entry55 viewsInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer
|
|
Repair Work55 viewsThis was not easy repair work done (because of lack of access) done by the wood working group. Part of the screen cover had not be laid correctly and there was an opening with no screen protection. dozer
|
|
Interior: Framework54 viewsThe interior framework is established for the drywall sheeting to be installed. The very beginning of the process is establishing a straight line for every level to be used (if there is a step there would be the step level and the main level). This is done using the water clear tubing method and then setting the level lines in red chalk.dozer
|
|
Bedroom Installation54 viewsThe first thing done is that the level of the lower step of the ceiling is established around the outside perimeter. The frame is being set up for a lower step which extends outward 60 centimeters and is 15 centimeters deep. dozer
|
|
|
|
|
|