|

Most viewed - Phala - "Drilling a Well" |

Jan.30,2010147 viewsAlmost finished but this is the view of the piping both water and electric.pklongball
|
|

Jan.30,2010105 viewsI'm holding the pressure switch that will operate the pump control. I saw no brand name or where it was made and the install booklet disappeared before I could find it. But I know it will start the pump at about 20 psi and stop it at about 55 psi.pklongball
|
|

Jan.30,2010103 viewsThe bore is capped with a steel pipe fitting and then more pvc to the controlpklongball
|
|
|

Jan.30,2010102 viewsDay 3 they crew came back with the Franklin 1 hp pump and control, the automatic pressure switch and several lengths of blue PVC. They wired up the pump and attached the blue pvc in 4 meter lengths and dropped the pump down the hole. pklongball
|
|
|

Jan.30,2010101 viewsHere the creww is connecting the pvc piping. No yellow for the electric part just blue for all of it. I was not thrilled with the electric piece of the work and I will make "my" changes soon now that we have the system operatingpklongball
|
|

Jan.30,201099 viewsOnce it's all connected the boys made a quick test to be sure the pump would operate and ran it to see how much flow we had. They ran the pump a good 30 minutes with no shortage of water.pklongball
|
|

Jan.30,201098 viewsAnother view of the pressure control showing the built on pressure gauge. Nice to have.pklongball
|
|

Jan.29,201095 viewsJust more of the final drilling processpklongball
|
|

Jan.30,201095 viewsThen about 25 or 30 meters of pvcpklongball
|
|
|
|

|
|
|