July 999 viewsLong shot of the panel and the connection phase. All connections will be made and tested before he calls for the final inspection and the meter installpklongball
July 797 viewsHere is the empty box from one of the fans. We bought a brand called Starlight. I was actually looking at the Compass East brand called Sunlight and the rep a Homeworks talked my wife into this brand. All the units have a 10 year warranty on the motor so we shall see how they work I guess.pklongball
July 2196 views4 days from move in and the PEA came round to install our permanent meter.pklongball
July 794 viewsMaster bedroom fan unit in placepklongball
July 792 viewsThis is an empty box from the second style of Starlight fan. Two of the units have a external 3 way rotary switch to turn on to the desired speed and the other 3 fans have the usual pull chain on the motor. None have lights.pklongball
July 2192 viewsHere we have a PEA man connecting the meter to the main supply lines. We now have power and the permanent meterpklongball
July 786 viewsSparky has installed most of the lights now. Here we have the main room chandelierpklongball
July 782 viewsTwo down lights will light the sidewalk to the back steps.pklongball