footing hole going down all in!normal steel cement const. chaing raiotis-a
standard steel concrete constwe priced steel vs wood framing steel was 38k vs wood at 56k tbat so i opted steel cement
not as astetic as wood but am sure termitus etus lessus z cement/steelotis-a
load up 1st flr roof/2nd floorsunny time progressotis-a
ritzy2putn on floor.cieling 2 columns std const of 4 rebar, no plans used no permits required wife's father build based on prior experience at this point I am out about $10k (which includes land)otis-a
putting on the ritzputting on the floor/cielingotis-a
the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-a