happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Image search results - "eng"
10768b.jpg
roof supportsopted steel roof supports steel 38k tb vs wood 56k tbotis-a
e9634816.jpg
columns 1st levelnormal steel concreteotis-a
june32010a2.jpg
standard steel concrete constwe priced steel vs wood framing steel was 38k vs wood at 56k tbat so i opted steel cement
not as astetic as wood but am sure termitus etus lessus z cement/steel
otis-a
june32010b2.jpg
load up 1st flr roof/2nd floorsunny time progressotis-a
june32010c2.jpg
ritzy2putn on floor.cieling 2 columns std const of 4 rebar, no plans used no permits required wife's father build based on prior experience at this point I am out about $10k (which includes land)otis-a
june32010e2.jpg
putting on the ritzputting on the floor/cielingotis-a
   
6 files on 1 page(s)

Debug Info 
Debug Output: show / hide