|
Image search results - "chaing" |
|
roof supportsopted steel roof supports steel 38k tb vs wood 56k tbotis-a
|
|
columns 1st levelnormal steel concreteotis-a
|
|
beams going innormal steel cement const. chaing raiotis-a
|
|
q/c team make steel inspectionnormal steel cement const. chaing raiotis-a
|
|
column formsnormal steel cement const. chaing raiotis-a
|
|
footing hole going down all in!normal steel cement const. chaing raiotis-a
|
|
ritzy2putn on floor.cieling 2 columns std const of 4 rebar, no plans used no permits required wife's father build based on prior experience at this point I am out about $10k (which includes land)otis-a
|
|
the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-a
|
|
the Thai family areasmak dab across field is big Aunty hse, up horizontal road by 3 houses is MTW family & all around r cuz's. So lots of SadiKa's between Aunty hse & the site. Sized based on Auntys' but went to two floors so room space about same but leaves some area to park, keep chickens, barbque, and maybe garden. Sized by tile count at 1/3 m per tile. Story goes Aunty wanted this plot but owner no sell at that time.otis-a
|
|
|
|
|
|
|
|